Billiard tables for hotels, villas, residences and architectural projects
Coordinate dimensions, materials, lighting, floor, delivery and bespoke production with architects in one project file.
Last updated: 2026-07-26
Architectural coordination
External dimensions alone are not enough. Cue swing, viewing area, columns, doors, lighting axis, flooring and service access should be shown on drawings.
Material and colour board
Wood, metal, cloth, pockets, sights and lighting should be selected together. Final approval should use physical samples because renders and production can differ.
Delivery and protection
Plan entry route, floor protection, lift capacity and working hours. Dust, adhesive and heavy loads must be isolated from finished surfaces.
Post-project service
For hotels and corporate projects, record the responsible contact, serial number, service access and maintenance schedule. Periodic checks preserve the guest experience.
Manufacturer note
Every room, table and service requirement is different. Final dimensions, materials, prices and application decisions should be based on verified technical information or a site survey.
Frequently asked questions
Which technical files can be supplied to architects?
Depending on the project, overall dimensions, playing area, room clearance, access, electrical and lighting notes, finishes, weight and 2D/3D layout files can be prepared.
When should a table be selected for a hotel or villa project?
Select during design before flooring, doors, stairs, lighting and furniture are final. Late selection can create access and cue-clearance problems.